What’s Involved in a Fence Permit in South Florida?

Getting a fence installed isn’t just about picking a style and getting started.

In South Florida, most projects require a permit and before that permit is even submitted, there’s a detailed process that needs to be completed correctly.

When it’s handled the right way, everything moves smoothly. When it’s rushed or incomplete, delays follow.

STEP 1: Pre-Permit Preparation

Before anything is submitted to the city, our permit coordinator prepares a complete application package.

SURVEY LAYOUT

Your fence layout is marked directly on your property survey to ensure proper placement and compliance with property lines and easements.

DOCUMENT PREPARATION

All required permit documents are completed and notarized.

UTILITY EASEMENT APPROVALS

If your property has easements, approvals are coordinated with the necessary utility companies.

ENGINEER DRAWINGS
(IF NEEDED)

For certain fence types, engineered drawings are ordered to meet structural and wind-load requirements.

COUNTY RECORDING

Required documents are recorded with the county before submission.
All of this is completed before the permit is submitted.

STEP 2: PERMIT SUBMISSION AND CITY REVIEW

Once the application is fully prepared:

THE PERMIT IS SUBMITTED TO THE CITY

THE CITY REVIEWS IT FOR CODE COMPLIANCE

APPROVAL IS ISSUED

In South Florida, permits are reviewed as a complete package. If anything is missing or incorrect, the application can be rejected and the timeline resets.

STEP 3: INSTALLATION AND FINAL INSPECTION

After the permit is approved:

INSTALLATION IS SCHEDULED

THE FENCE IS BUILT ACCORDING TO THE APPROVED LAYOUT

A FINAL INSPECTION IS COMPLETED IF REQUIRED

TIMING

Most projects take a few weeks to move through approvals before installation begins. Some move faster. Some take longer. That portion of the timeline is outside of anyone’s control, but we stay on top of it and keep things moving.

WHY THIS MATTERS

Skipping steps or rushing the process can lead to:
• Delays and fines
• Having to move or remove the fence
• Issues when selling your home later
Doing it right the first time avoids all of that.

THE BOTTOM LINE

A lot happens before a fence permit is even submitted.
When everything is prepared properly upfront, the rest of the project runs the way it should—smooth, predictable, and without surprises.

WHAT MOST HOMEOWNERS THINK VS WHAT ACTUALLY HAPPENS

Common Assumption

What Actually Happens

“The permit is just paperwork.”

The permit is a full package. Survey markup, notarized documents, utility approvals, and sometimes engineer drawings all have to be completed before submission.

“We can start right after signing.”

Most projects require approvals first. Work typically cannot begin until the permit is approved.

“The city reviews things as they come in.”

The city reviews everything at once. If anything is missing, the application gets rejected and the timeline resets.

“All fence companies handle permits the same way.”

The process is the same, but how it’s handled makes a big difference. Incomplete or rushed submissions cause delays.

“This should only take a few days.”

In South Florida, approvals usually take a few weeks depending on the city and requirements.

“If something is wrong, it can just be fixed later.”

Mistakes can mean rework, added costs, or even having to remove and reinstall sections of the fence.

THIS IS WHY PREPARATION MATTERS.

All of this is completed before the permit is submitted.